Workload Analysis of Production Workers at PT Mitra Maharta: Applying the NASA-TLX and Full-Time Equivalent Methods
DOI:
https://doi.org/10.37385/ijedr.v5i2.5395Keywords:
Full Time Equivalent, NASA-TLX, WorkloadAbstract
Combine Harvester is one of the products of PT Mitra Maharta that requires high work demands and accuracy in the production process. Workers in the production division tend to cause uneven workloads due to intensive labor demands and the obligation to work with high accuracy. Therefore, measurements of the workloads experienced by workers are needed. The NASA-TLX and FTE (Full Time Equivalent) methods were used to measure the workloads of 14 production workers. Some workers have an average WWL value from the range of 64 - 84.33 with the categories “High” to “Very High” in the NASA-TLX calculation, while in the FTE method calculation, they have an FTE index value from the range of 0.79 - 1.32 with the categories “Underload”, “Normal”, and “Overload”. Recommendations from this study include task restructuring and reallocation of human resources, additional manpower, as well as policies such as adequate rest time and training to improve worker efficiency.
References
Achmar, M. F., Saptaputra, S. K., & Yunawati, I. (2022). Hubungan Beban Kerja dan Kelelahan Kerja Dengan Stres Kerja Pada Pekerja di PT X. Jurnal Multidisiplin Madani, 2(9), Article 9. https://doi.org/10.55927/mudima.v2i9.1216
Ananda, S. R., & Suliantoro, H. (2022). Analisis Beban Kerja Mental Dengan Metode National Aeronautics And Space Administration- Task Load Index (NASA-TLX) Pada PT. Bintang Prima. Industrial Engineering Online Journal, 11(4), Article 4. https://ejournal3.undip.ac.id/index.php/ieoj/article/view/35978
Andivas, M., Harits, D., Wibowo, A. H., Thoriq, E. A., & Ghazali, I. (2023). The Mental Workload Analysis on Female Educators During Covid-19 Pandemic Using Nasa-TLX Method. Spektrum Industri, 21(1), Article 1. https://doi.org/10.12928/si.v21i1.87
Bakhtiar, B., Syarifuddin, S., & Putri, M. P. (2021). Pengukuran Beban Kerja Dengan Metode Full Time Equivalent Dan Penentuan Jumlah Tenaga Kerja Efektif Menggunakan Workload Analysis. Journal of Industrial Engineering and Operation Management (JIEOM), 4(1), Article 1. https://doi.org/10.31602/jieom.v4i1.5332
Cecep, R. F. (2019). ANALISIS BEBAN KERJA KELOMPOK PENYELENGGARA PEMUNGUTAN SUARA (KPPS) MENGGUNAKAN METODE FTE (FULL TIME EQUIVALENT) PADA PEMILIHAN UMUM SERETAK TAHUN 2019 DI KABUPATEN BANGKA TENGAH. Electoral Governance Jurnal Tata Kelola Pemilu Indonesia, 1(1), Article 1. https://doi.org/10.46874/tkp.v1i1.15
daniel, Widowaty, I., Sutardjo, & Diem, D. A. R. (2022). Analisa Beban Kerja Pembuatan Lemari Kaca Alumunium Dengan Pendekatan Metode Full Time Equivalent (FTE) (Studi Kasus: CV. Hitajaya Alumunium, Purwakarta. Jurnal Teknologika, 12(2), Article 2. https://doi.org/10.51132/teknologika.v12iNo
Darmasari, E. (2022). Pengaruh Beban Kerja dan Stres Kerja terhadap Produktivitas Kerja Karyawan CV.Sinar Utama Yamaha Kota samarinda. Jurnal Administrasi Bisnis FISIPOL UNMUL, 10(4), 296. https://doi.org/10.54144/jadbis.v10i4.9190
Fithri, P., & Anisa, W. F. (2017). Pengukuran Beban Kerja Psikologis dan Fisiologis Pekerja di Industri Tekstil. Jurnal Optimasi Sistem Industri, 16(2), 120. https://doi.org/10.25077/josi.v16.n2.p120-130.2017
Gunawan, N. M., & Sriathi, A. A. (2019). PENGARUH STRES KERJA, KOMITMEN ORGANISASIONAL, DAN GAYA KEPEMIMPINAN TERHADAP KEPUASAN KERJA KARYAWAN. E-Jurnal Manajemen, 8(9), 5344–5371. https://doi.org/10.24843/EJMUNUD.2019.v08.i09.p01
Hadi, W., S, D. S., & Putri, T. A. (2022). Analisis Pengukuran Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Terhadap Kinerja Karyawan Divisi Gudang Free Zone PT. Bimaruna Jaya. LOGISTIK, 15(02), Article 02. https://doi.org/10.21009/logistik.v15i02.30459
Hafizah, R., & Azwir, H. H. (2022). Workload Analysis on Employee Performance to Determine the Optimal Number of Employees by Using Full-Time Equivalent and NASA-TLX at PT. Z. JIE Scientific Journal on Research and Application of Industrial System, 7(2), Article 2. https://doi.org/10.33021/jie.v7i2.3837
Hart, S. G., & Staveland, L. E. (1988). Development of NASA-TLX (Task Load Index): Results of Empirical and Theoretical Research. In Advances in Psychology (Vol. 52, pp. 139–183). Elsevier. https://doi.org/10.1016/S0166-4115(08)62386-9
Hasibuan, M. T., Maidalena, M., & Harahap, R. D. (2023). Evaluasi Kebutuhan Tenaga Kerja Pada Divisi Pelayanan SDM dan Umum Regional 1 PT Pelabuhan Indonesia (Persero) Dengan Pendekatan Metode Full Time Equivalent (FTE). Management Studies and Entrepreneurship Journal (MSEJ), 4(5), Article 5. https://doi.org/10.37385/msej.v4i5.3037
Kurniawan, H., Yulianah, Y., & Shaura, R. K. (2022). Workload Analysis Using the Full Time Equivalent (FTE) Method to Optimizing Labor. Enrichment?: Journal of Management, 12(4), Article 4. https://doi.org/10.35335/enrichment.v12i4.772
Kusmindari, C. D., & Setiawan, H. (2021). Ergo-Workload Pekerja Ukm Pempek Glory Berbasis Metode Full Time Equivalent | Jurnal Tekno. https://journal.binadarma.ac.id/index.php/jurnaltekno/article/view/1298
Kustian, G. D., & Asyari, H. (2024). Workload Analysis on Production Planning Control Division Pressure Part Using Full Time Equivalent Method and NASA TLX at PT ABC. Proceeding ICMA-SURE, 3(1), Article 1. https://doi.org/10.20884/2.procicma.2024.3.1.10145
Kusumah, R. M. (2021). Analisis Kebutuhan Tenaga Kerja Petugas Pendaftaran Berdasarkan Metode Workload Indicator Staffing Need (Wisn) Di Uptd Puskesmas X Tahun 2021. MANNERS (Management and Entrepreneurship Journal), 4(2), Article 2. https://doi.org/10.56244/manners.v4i2.416
Matiro, M. A. D., Mau, R. S., Rasyid, A., & Rauf, F. A. (2021). Pengukuran Beban Kerja Menggunakan Metode Full Time Equivalent (FTE) Pada Divisi Proses PT. Delta Subur Permai. Jambura Industrial Review (JIREV), 1(1), Article 1. https://doi.org/10.37905/jirev.v1i1.7774
Meri, M., Fandeli, H., Linda, R., Irmayani, I., & Febrian, R. (2023). Analisis Beban Kerja Mental Pada Pekerja UMKM Tahu Mtb Menggunakan Metode NASA-TLX. Journal Of Indonesian Social Society (JISS), 1(1), Article 1. https://doi.org/10.59435/jiss.v1i1.24
Nadhim, M. A., & Apsari, A. E. (2023). Analisis Beban Kerja Fisik dan Mental dengan Menggunakan Metode Work Sampling dan NASA-TLX sebagai Upaya Peningkatan Produktivitas Kerja di PT. Putra Sulung Makmur Metal Castindo. ULIL ALBAB?: Jurnal Ilmiah Multidisiplin, 2(9), 4263–4269. https://doi.org/10.56799/jim.v2i9.2085
Nugroho, K. J. (2021). Analisis Beban Kerja, Motivasi Kerja Dan Lingkungan Kerja Terhadap Produktivitas Kerja Pegawai Pada Badan Pusat Statistik Kabupaten Blitar. Otonomi, 21(1), Article 1. https://doi.org/10.32503/otonomi.v21i1.1650
Nurriza, P. A., As’ad, N. R., & Achiraeniwati, E. (2024). Perancangan Jam Kerja berdasarkan Beban Kerja Full Time Equivalent dan NASA–TLX pada Stasiun Kerja Printing PT. XYZ. Bandung Conference Series: Industrial Engineering Science, 4(1), Article 1. https://doi.org/10.29313/bcsies.v4i1.10262
Purnami, N. M. I., & Utama, I. W. M. (2019). Pengaruh Pemberdayaan, Motivasi Dan Lingkungan Kerja Terhadap Produktivitas Kerja Karyawan. E-Jurnal Manajemen Universitas Udayana, 8(9), 5611. https://doi.org/10.24843/EJMUNUD.2019.v08.i09.p13
Putra, A. A., Pratama, R. C., & Farahdiansari, A. P. (2023). Analysis Of Mental Workload With NASA- TLX Method On Employees Of Kareb Bojonegoro Cooperative. Journal of Information System, Technology and Engineering, 1(3), Article 3. https://doi.org/10.61487/jiste.v1i3.28
Rachmuddin, Y., Dewi, D. S., & Dewi, R. S. (2021). Workload analysis using Modified Full Time Equivalent (M-FTE) and NASA-TLX methods to optimize engineer headcount in the engineering services department. IOP Conference Series: Materials Science and Engineering, 1072(1), 012036. https://doi.org/10.1088/1757-899X/1072/1/012036
Ramadani, L. A., Halin, H., & Purnamasari, E. D. (2024). Pengaruh Beban Kerja dan Kompensasi Terhadap Kinerja Karyawan Rindang Coffee Shop di Palembang. EKOMA?: Jurnal Ekonomi, Manajemen, Akuntansi, 3(3), 771–783. https://doi.org/10.56799/ekoma.v3i3.3106
Ramadhan, H. N., Irfana, T. B., Supriyanto, S., Thamrin, D., & Siahaan, M. (2024). Pengaruh Kesehatan Kerja Dan Beban Kerja Terhadap Work Life Balance: Studi Kasus PT. Citra Mediatama Indonesia. Jurnal Penelitian Ekonomi Manajemen Dan Bisnis, 3(2), 197–211. https://doi.org/10.55606/jekombis.v3i2.3491
Schuff, D., Corral, K., & Turetken, O. (2011). Comparing the understandability of alternative data warehouse schemas: An empirical study. Decision Support Systems, 52(1), 9–20. https://doi.org/10.1016/j.dss.2011.04.003
Silalong, L. A. S., Sari, S., Arfianto, D., Pujiyanto, I., & Hanifah, D. H. (2024). Analysis Of Mental Workload Final Year Students Due To Online Learning With Nasa-Tlx Method. Hearty, 12(2), Article 2. https://doi.org/10.32832/hearty.v12i2.5458
Trisnawaty, M., & Parwoto, P. (2021). Pengaruh Lingkungan Kerja Dan Beban Kerja Terhadap Produktivitas Kerja Karyawan (Studi Kasus pada Bagian Produksi 1 PT JS Jakarta). Jurnal Manajemen Dayasaing, 22(2), 84–92. https://doi.org/10.23917/dayasaing.v22i2.12361
Wicaksono, S., & Fadlillah, A. M. (2021). Implementation of Full Time Equivalent Method in Determining the Workload Analysis of Logistics Admin Employees of PT X in Jakarta, Indonesia. European Journal of Business and Management Research, 6(5), Article 5. https://doi.org/10.24018/ejbmr.2021.6.5.1076
Yanti, R., Roswaty, R., & Emilda, E. (2023). Pengaruh Beban Kerja dan Kompensasi terhadap Kinerja Karyawan pada PT Pinang Witmas Sejati Klk Desa Mangsang. Eksis: Jurnal Ilmiah Ekonomi Dan Bisnis, 14(1), Article 1. https://doi.org/10.33087/eksis.v14i1.333
Zidan, M. F., Apriani, R. A., Basuki, D. E., Wibowo, L. F. N., & Mukarim, R. N. (2024). Analysis of Mental Workload on Sugar Production Mechanical Workers Using the Nasa-TLX Method. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 10(1), Article 1. https://doi.org/10.24014/jti.v10i1.29000